ball test procedure as boiler tubes
Others

Molten salt heaters use molten potassium nitrate and sodium nitrite as heating media. Molten salt heater will heat the powder salt over the melting point until the viscosity of the molten salt allows circulating pump works, after the whole system is under circulating condition, then feed then into the thermal fluid heater for further circulating rising temperature to make it to be recycling used. Normal media working temperature is 400-550℃, top working temperature could reach 600℃.

Technical advantages

Digitized manufacture

  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of square coil tube adopts CNC three-dimensional tube bending machine, no forced shaping.
  • The manufacture of serpentuator adopts serpentuator automatic production line, once-forming.

Long life span

  • The optimized radiation heating surface and convective heating surface, the medium flow is more reasonable, without overheat of the carrier and reduce the life;
  • Convection section: optimize convection heating surface and adopt effective fix and structural support to make its working life longer.
  • Set up effective flue gas partition for convection heating surface and cast partition to make it works longer.

Less fuel consumption

  • Use superior refractory brick to build inside and superior perlite in the middle. Keep the furnace temperature under 50℃ to make the minimization of loss.
  • Furnace adopts double close line coil, which makes heating surface sufficient.

Add Comment

U Bent Tubes Shaping in U Parts - Flatten|Ball Passing Te

4.When the mould gap turn into about 5mm, then finished. We use a red skin to test. 5.Loosen the argent screws of hydraulic pump. 6.Then the pressure of hydraulic cylinder disappears. 7.Take the U bend stainless steel tubes out. 8.The specimen stainless steel tubes outside diameter on U bend parts shaped to 23.8mm now.

Boiler Inspections - Veol

the boiler prior to shutdown. Follow the boiler manufacture’s cool down procedure and be sure to rinse out the boiler as soon as the boiler is cool to avoid dried and baked on sludge deposits later on. If the cooled boiler is to be left filled with water for an extended period of time, take the proper

DNV Ship rules Pt.4 Ch.6 - Piping Syste

Amended, Rules for Ships, July 2008 see Pt.0 Ch.1 Sec.3 January 2010 Pt.4 Ch.6 Sec.1 – Page 5 DET NORSKE VERITAS SECTION 1 GENERAL REQUIREMENTS A. Classification

Chapter 8 Boilers - NAVY B

The boiler room must also be large enough to allow for boiler maintenance, for retubing, and for removing and replacing the boiler. The tube length of a boiler may be from 2 feet 6 inches to at least 10 feet, and possibly longer. To simplify the removal of the tubes, ensure the boiler room is long enough or has a door located behind the boiler.

Fire Tube Steam Boiler Example - clopidogrel.

Third Party Inspection for Fire Tube Boiler - Procedure. The Third Party Inspection for Fire Tube Boiler article provides a sample inspection and test procedure for fire tube boiler in manufacturing shop. This might be reviewd with fire tube boiler inspection and test plan..

Boiler Tube Cleaning | Goodw

These machines are, in turn, connected to powerful vacuums that draw the loosened soot from the tubes, simultaneously, leaving the tubes, boiler room and operator completely clean. Some firetube boilers develop scale deposits.

What action is necessary when a tube is suddenly leak

Tube leakage is the serious problem in Boiler, it could cause heavy damage to Boiler. Hence it is very essential to avoid this problem as possible as by conducting hydraulic test before Boiler start up. I am below giving what action to be taken if any minor leakage has occurred in Boiler tubes .

Premium Solutions for Boiler Tube Testing - Vallour

– clear localization of defective boiler tubes – verification of test results by destruc-tive testing – extensive testing and materials exper-tise of a global leading manufacturer of boiler tubes – planning safety and cost-effective-ness through reliable test results – power plant operators acquire know-

NDE Techniques for Reliable Inspection of Carbon Steel Tub

NDE Techniques for Reliable Inspection of Carbon Steel Tubes,: 106896356-API6D-Ball-Valves-Inspection-and-Test-Pro (3) Low Pressure, NDE

EXCERPTS FROM: ASME BOILER AND PRESSURE VESSEL COD

1 Power boiler − a boiler in which steam or other vapor is generated at a pres-sure of more than 15 psi (100 kPa) for use external to itself. 2 Electric boiler − a power boiler or a high−temperature water boiler in which the source of heat is electricity. 3 Miniature boiler − a power boiler or a high−temperature water boiler in

Boiler Hydrostatic Testing - Banks Engineeri

The latter test will avoid the necessity of blanking or gagging of safety valves, removing piping and plugging various pipe openings, removing controls and gage glasses, etc. The boiler and process lines must be completely vented in order to fill them with water. The following is a recommended procedure for hydrostatic testing: 1.